working time or wet lay-up time

Handling epoxy This section explains the fundamentals of epoxy curing and the steps for proper dispensing, mixing, and adding fillers to assure that every batch of epoxy cures to a useful high-strength solid. 8.3.1 Understanding epoxy's cure stages Mixing epoxy resin and hardener begins a chemical reaction that transforms the combined liquid ingredients to a solid. The time it takes for this transformation is the cure time. decking boards cost per square metreAs it cures the epoxy passes from the liquid state, through a gel state, before it reaches a solid state (Figure 8-3). 1. Liquid—Open time Open time (also working time or wet lay-up time) is the portion of the cure time, after mixing, that the resin/hardener mixture remains a liquid and is workable and suitable for application.
All assembly and clamping should take place during the open time to assure a dependable bond. 2. Gel—Initial cure The mixture passes into an initial cure phase (also called the green stage) when it begins to gel, or "kick off". The epoxy is no longer workable and will no longer feel tacky. During this stage it progresses from a soft gel consistency to the firmness of hard rubber. You will be able to dent it with your thumb nail. above ground pool post covered in compositeThe mixture will become tack free about midway through the initial cure phase. While it is still tacky, a new application of epoxy will still chemically link with it, so the surface may still be bonded to or re-coated without special preparation. However, this ability diminishes as the mixture approaches the final cure phase.
3. Solid—Final cure The epoxy mixture has cured to a solid state and can be dry sanded and shaped. You should not be able to dent it with your thumbnail. At this point the epoxy has reached most of its ultimate strength, so clamps can be removed. It will continue to cure over the next several days at room temperature. A new application of epoxy will no longer chemically link to it, so the surface of the epoxy must be properly prepared and sanded before re-coating to achieve a good mechanical,low cost privacy composite fencing secondary bond. See Surface Preparation 8.4.1. 8.3.2 Understanding and controlling cure time Open time and cure time govern much of the activity of building and repairing with epoxy. Open time dictates the time available for mixing, application, smoothing, shaping, assembly and clamping.

2015年5月12日星期二

Rising cost of building materials

Data show that from the beginning of the year to date, with copper as the main material of the faucet total price three times the average price increases of 10% to 20%, compared to last year, the price increases as high as 30% to 40%. It was explained that the toilet in the furnace to be fired, but some companies furnace fuel is gasoline that they produce toilet is also affected by the impact of higher gasoline prices, prices rose slightly. Oil prices increase manufacturing costs, also pulled up logistics costs. Analysis of the industry, building materials for some big-ticket goods, wood plastic outdoor fencesuch as tiles, the proportion of transport costs as a percentage of their relatively high, after rising oil prices, although no increase in manufacturing costs of such goods, but it increases the cost of logistics, disguised increase costs.

Therefore, cause such ceramic products in the terminal market prices. Insiders told reporters ceramic terminal market, in accordance with the trend in previous years, ceramic products prices generally between about May to July each year will be cheaper, the highest price when in fact after August until October. But this year's market is "up" one. No wonder some dealers have shook his head sigh: this year's market more difficult than in previous years! It operates in Zhengzhou, three high-end furniture brands Ho general introduction, furniture, building materials industry in the marketing force,A variety of floor, wall, fences and other wood plastic classic casethe direct cause of sales in the first half of 2008 gave us the pressure and irritation. Because the building materials and furniture are not passionate consumer goods, so the department store category tricks such as marketing tool can not follow, they first had to change their image, as well as to the customer's first impression.

Before buying furniture, building materials, customers can enjoy the most is the specific shopping guide, now it is a leading experience, a kind of home comfort and relaxation. On this basis, the business and then make some none other benefits, so that customers embrace, the logical thing is to buy the product. Price unsuccessful, straight reminders industry consolidation Oil prices, increased labor costs, midwest manufacturing composite fencinghave an impact on the transport sector heavily dependent on furniture, building materials industry, the price of wind spread the industry. However, according to the home market in the first half of 2008, the feasibility of the retail end prices is almost zero. Thus, in the dual reasons prices rose and the market situation can not pressure the industry reshuffle is inevitable consolidation. "This year we put more publicity, the number of products sold quite a few, but only a little profit."